日本欧美亚洲,八戒看免费高清电视剧网站,职场的韩国电影三级,遮天大帝陆羽姜初然小说,爆操双飞欧美,免费观看高清电影的应用场景,穿越清朝完结小说,色的视频无遮挡中文字幕国产,人人人人澡人人爽久久av

冷再生施工和機械租賃業(yè)務
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務熱線

18264104888

新聞中心

首頁>>新聞中心

冷再生機施工進行碾壓時的五點操作

來源:http://www.xy-cms.com/ 日期:2022-10-24 發(fā)布人:
在做好冷再生施工的過程中能夠節(jié)省很多的瀝清、沙石等原料的應用,還能夠節(jié)約工程項目的時間步驟。那么冷再生機施工進行碾壓時的操作是怎樣的呢?冷再生機租賃廠家為您講解。
In the process of cold recycling construction, it can save a lot of raw materials such as asphalt, sand and gravel, and save the time and steps of the project. What is the operation of the cold recycling machine when rolling? The cold regeneration machine rental manufacturer will explain it to you.
(1)整形后,當混合料的含水量為佳含水量(+1%~+2%)時,應立刻用壓路機在構(gòu)造層全寬內(nèi)停止碾壓。直線和不設超高的平曲線段,由兩側(cè)路肩向路中心碾時,應堆疊1/2輪寬,后輪需超越兩段的接縫處,后輪壓完路面全寬時,即為一遍。普通需碾壓4~6遍。
(1) After shaping, when the moisture content of the mixture is good (+1%~+2%), the roller shall be used to stop rolling within the full width of the structural layer immediately. For straight lines and flat curved sections without superelevation, when rolling from the shoulders on both sides to the center of the road, 1/2 wheel width shall be stacked. The rear wheel shall exceed the joint of the two sections. When the rear wheel has finished rolling the full width of the road, it is one time. Generally, it needs to be rolled 4~6 times.
(2)嚴禁壓路機在已完成的或正在碾壓的路段上調(diào)頭或急剎車,應保證改進土層外表不受毀壞。
(2) It is strictly forbidden for the roller to turn around or brake suddenly on the completed or rolling road section, and the surface of the improved soil layer shall not be damaged.
(3)碾壓過程中,水泥改進土的外表應一直堅持潮濕,如水分蒸發(fā)過快,應及時補撒少量的水,但嚴禁灑大水碾壓。
(3) During rolling, the surface of cement improved soil shall always be wet. If the water evaporates too fast, a small amount of water shall be sprinkled in time, but it is strictly prohibited to sprinkle large amounts of water for rolling.
冷再生機租賃
(4)經(jīng)過拌和、整形的水泥改進土,宜在水泥初凝前并應在實驗肯定的延遲時間內(nèi)完成碾壓,并到達請求的密實度,同時沒有明顯的輪跡。
(4) After mixing and shaping, the cement improved soil should be rolled before the initial setting of cement and within the delay time confirmed by the experiment to reach the required compactness without obvious wheel tracks.
(5)在碾壓完畢之前,用平地機再終平一次,使其縱向順適,路拱和高契合設計請求。終平應認真停止,需將部分高出局部刮除并掃出路外;關于部分低洼之處,不再停止找補,可留待下層施工時處置。
(5) Before the rolling is completed, the grader shall be used for final leveling again to make it smooth in the longitudinal direction, and the crown and height shall meet the design requirements. The final leveling shall be stopped carefully, and the part higher than the local level shall be scraped and swept away; Some low-lying areas will not be repaired and can be left for disposal during the construction of the lower layer.
冷再生機施工進行碾壓時的五點操作就講解到這里了,提醒您對此在使用過程中做好維護保養(yǎng)事項,以免出現(xiàn)問題影響設備質(zhì)量以及施工質(zhì)量!更多注意事項的了解就來我們網(wǎng)站http://www.xy-cms.com咨詢吧!
This is the end of the five points of operation during the construction of the cold recycling machine. We remind you to do a good job of maintenance during the use of this machine, so as to avoid problems affecting the equipment quality and construction quality! For more information, please come to our website http://www.xy-cms.com Consult!

閱讀/ Recommended reading

  S102濟青線諸城曹家泊高密柴溝段、高密柴溝高密膠州界段修復養(yǎng)護工程施工項目冷再生試驗段建設在柴溝鎮(zhèn)區(qū)東、西兩個標段同步展開。濰坊市公路事業(yè)發(fā)展中心、濰坊交通發(fā)展集團、高...

冷再生機租賃國道改建顯“神功” 2025-10-30
冷再生機租賃助四川平昌加快公路提檔升級改造 2025-10-29
冷再生機租賃助力公路養(yǎng)護中心進行公路工程建設 2025-10-28
冷再生機憑借其節(jié)約能源養(yǎng)護時間短助力公路部門快速建設 2025-10-27

產(chǎn)品/ Recommended products