冷再生機對瀝青路面改造的要求

來源:http://www.xy-cms.com/ 日期:2022-12-30 發(fā)布人:
冷再生機是指瀝青路面就地冷再生是利用一體化的再生設備、添加材料、一 次拌和成型工藝,通過新鋪結構面層,構成舊路面改造新的一套完整體系。下面冷再生機出租廠家就來講解一下關于對瀝青路面改造的配置要求和準備工作。
Cold recycling machine refers to the on-site cold recycling of asphalt pavement, which is a new complete system for the reconstruction of old pavement by using the integrated recycling equipment, added materials, and one-time mixing and molding process to pave the new structural surface. Next, the cold recycling machine rental manufacturer will explain the configuration requirements and preparations for asphalt pavement reconstruction.
準備工作:
preparation:
再生前的各項準備工作在施工前到位,確保工期正常進行。主要內容包括:人員準備、機 械準備、材料準備、交通協(xié)調及后勤保障。
All preparations before regeneration shall be in place before construction to ensure the normal progress of the construction period. The main contents include: personnel preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
材料要求:
Material requirements:
水泥選用強度等級為32.5、初凝時間≥3h、終凝時間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥 。水泥應具有良好的工作性、低水化、高后期強度、耐久性、耐腐蝕性和抗裂性能。
Portland or ordinary Portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. Cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
冷再生機出租
機械要求:
Mechanical requirements:
工程施工過程通過再生機組來完成,再生機組包括:冷再生主機、水泥稀漿車、平地機、 壓路機等。
The construction process of the project is completed by regeneration units, including cold regeneration host, cement slurry truck, grader, roller, etc.
人員要求:
Personnel requirements:
工程技術人員及機械操作人員應經過冷再生培訓并經過考核合格后方可上崗。
Engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
工程協(xié)調:
Project coordination:
作好施工總體計劃,采取不中斷交通半幅施工,作好施工期間交通疏導工作,準備施工作 業(yè)面的遮擋。
The overall construction plan shall be prepared, and the half width construction without interruption of traffic shall be adopted. The traffic diversion work during the construction shall be done well, and the shelter of the construction working face shall be prepared.
冷再生機對瀝青路面改造的要求相關內容就從以上所講中了解的,您有什么問題或者疑惑,可以隨時來我們網(wǎng)站http://www.xy-cms.com進行咨詢了解!
The requirements of cold recycling machine for asphalt pavement reconstruction are understood from the above. If you have any questions or doubts, you can come to our website at any time http://www.xy-cms.com Ask about it!

閱讀/ Recommended reading

  S102濟青線諸城曹家泊高密柴溝段、高密柴溝高密膠州界段修復養(yǎng)護工程施工項目冷再生試驗段建設在柴溝鎮(zhèn)區(qū)東、西兩個標段同步展開。濰坊市公路事業(yè)發(fā)展中心、濰坊交通發(fā)展集團、高...

冷再生機租賃國道改建顯“神功” 2025-10-30
冷再生機租賃助四川平昌加快公路提檔升級改造 2025-10-29
冷再生機租賃助力公路養(yǎng)護中心進行公路工程建設 2025-10-28
冷再生機憑借其節(jié)約能源養(yǎng)護時間短助力公路部門快速建設 2025-10-27

產品/ Recommended products